Ohlone Greenway in El Cerrito: Fall 2026 Events and Updates

"In the early 1990s El Cerrito's two mile stretch of the Ohlone Greenway had exactly one tree–until someone cut it down." That's how the El Cerrito Historical Society opens its listing for a November walk along the path. The City now describes the Greenway as 24 acres of natural habitat and 2.7 miles of walking trails, with creek access, frog habitat, wetland restoration, grassy areas and playground equipment. According to the Society, the change came from volunteers, a city contract arborist, and a committed city official and staff.

The same split shows up on the path this fall. Big funded projects are reshaping the Greenway's two ends at El Cerrito Plaza BART and El Cerrito del Norte BART. Nearly everything planned for the stretch between them comes from a commission, a volunteer group, or a historian with a sign-up sheet.

The south end is a construction site with a bike room facing the path

On March 6, 2026, the City held the groundbreaking for Parcel A South. It's a six-story building with 70 affordable homes going up on the BART surface parking lot at El Cerrito Plaza. Its bike-storage room fronts the Ohlone Greenway. SF YIMBY reported that foundation work at 515 Richmond St. was underway by March 9. The full station plan calls for 743 apartments in six buildings, plus a public plaza, commercial space, a possible public library and a 145-space BART garage.

Parcel A South is expected to finish sometime in 2027. The City's release said the first quarter, and SF YIMBY said late in the year. The City's approved master-plan document also describes a future realignment of the Greenway and better station access. None of the published material says whether the path or the Cerrito Creek trail has a detour right now. The posted notices at the site are the best guide before you head out.

The north end is finished, and San Pablo Avenue may be next

The del Norte end is done. In July the City held a ribbon-cutting at the Mayfair Pedestrian Walkway to mark the end of the El Cerrito del Norte Complete Streets Project. That multiyear effort built on the 2021 modernization of the del Norte BART station.

Here's what changed on San Pablo Avenue, Eastshore Boulevard, Hill Street and Knott Avenue:

  • New bike lanes and cycle tracks
  • New crosswalks
  • In-lane bus boarding islands
  • Redesigned traffic lanes and signage
  • Pedestrian-level lighting, landscaping, benches and bike racks

The project cost nearly $15 million. The money came from a federal One Bay Area Grant, a state Affordable Housing Sustainable Communities grant, and Contra Costa Transportation Authority Measure J funds. Further south on San Pablo, the CCTA's San Pablo Avenue Safety and Access effort is still in planning. As of its May 2026 project page, no final design had been chosen. That page expected community engagement this summer and concept evaluation through fall and winter.

So at both stations, change is coming from grants, transit agencies and multiyear contracts, on timelines measured in years.

Between the stations, the calendar belongs to volunteers

The two miles in between work differently. Here's what's planned along the Greenway, or right beside it, this fall:

Date What Where Who's behind it
Sun., Oct. 11, 10 a.m. to noon Green Team cleanup Next to the Greenway at Potrero and Lexington City volunteer program
Sat., Oct. 17, 9 a.m. to 3 p.m. Fall 2026 Citywide Garage Sale Citywide Green El Cerrito
Sat., Oct. 17, 10 a.m. to 1 p.m. United Against Hate Week chalk art On the Greenway next to Centennial Park Human Relations Commission and Arts & Culture Commission
Mon., Nov. 9, 6 to 8 p.m. Rialto Cinemas Cerrito 20th anniversary 10070 San Pablo Ave. El Cerrito Historical Society
Sun., Nov. 15, 10 to 11 a.m. "Greening the Greenway" walk Starts at Fairmount Ave., ends at del Norte BART El Cerrito Historical Society

The October 17 chalk event comes the day before United Against Hate Week, which runs October 18 to 24. This year's theme is "Belonging in Action." Local artist Naima Yi will make a chalk centerpiece. There will also be music and a storytime hour for elementary-age kids, put together with suggestions from the El Cerrito Public Library.

The fall started the same way. On September 26 and 27, El Cerrito Trail Trekkers held its second annual Public Paths Festival. The first walk was an Ohlone Greenway History Walk, co-sponsored by the Historical Society and led by Dave Weinstein and Laura Lent. It covered the railroad that created the path, the city's early inhabitants and settlers, and the industries that once lined the tracks.

The creek near the Plaza has the same history

Cerrito Creek, at the south end of the Greenway, follows the same pattern. Friends of Five Creeks describes the El Cerrito Plaza section as a 2003 to 2004 restoration. The parking lot was moved back, the channel was reshaped, and a trail and native plants went in beside it. The group supplied signs, seating, trail work and planting, and the City gradually took over maintenance in 2017 and 2018. Just west of the Greenway, the group cleared blackberries and ivy in 2000, planted natives and installed seating rocks. In 2017 and 2018, an apartment project in the southeast corner of the Plaza parking lot extended the daylit creek west to Evelyn Avenue, with native planting and a trail alongside, and the apartment project now maintains that stretch.

During the September festival, Barbara Lass and Wade Huntley led a Cerrito Creek Stroll from Creekside Park at 3499 Santa Clara Ave. The listing described "a relatively newly reopened section of the creek by El Cerrito Plaza." It also covered the years Friends of Five Creeks spent restoring habitat along the creek. Twenty years of volunteer work along this creek is a big part of why the edge of the new Plaza development has a creek trail at all.

Where to stop along the way

These are the places named in this fall's listings and recent local coverage, roughly from the Plaza end outward:

  • Cafe Buenos Aires, 6401 Fairmount Ave. Nosh reported on September 29 that this Argentine cafe has opened in El Cerrito. It serves empanadas, including two vegan ones, plus alfajores, smoothies, coffee drinks and pastries. It already has one shop in West Berkeley and two in San Francisco.
  • The Greenway at Fairmount Avenue, across from El Cerrito Plaza BART. This is where the November 15 walk begins.
  • Rialto Cinemas Cerrito, 10070 San Pablo Ave., a short way off the path.
  • Centennial Park, home of the October 17 chalk event.
  • Richard Itaya mini-park at Manila and Kearney. The City lists it as a Greenway-side play area for younger school-age kids.
  • Baxter Creek Park at Conlon Avenue, a named access point on the Greenway.
  • The del Norte end, where the new crosswalks, benches and bus islands begin.

Two November dates about local persistence

The two Historical Society events in November tell similar stories. On November 9, the Society is marking 20 years since Rialto Cinemas Cerrito reopened. On November 1, 2006, "years of local efforts paid off, and the curtain rose again," as the Society puts it. The evening covers how the cinema was saved, restored and rebuilt. It also includes a screening of Rustin Thompson's documentary "The Last Pictures Shows," about people preserving theaters across the West. Refreshments will be for sale.

Six days later, the free "Greening the Greenway" walk covers the flat two miles from Fairmount Avenue to del Norte BART. Steve Price, the organizer and lead volunteer behind the replanting, and Steve Batchelder, then the city's consulting arborist, will talk along the way. The Society says every block has its own story, including "the mysterious Dinosaur Forest." For questions, the listing names Dave Weinstein at [email protected]. The walk ends at the del Norte station, where this summer's street upgrades start.

If you live near the Greenway and want to understand how Parcel A South and the del Norte upgrades might affect your block in the years ahead, Homes by Karthiga is happy to go through what's planned at each station with you. Get your personalized market strategy whenever it's useful.